http://www.bokapowell.com requires a more recent version of the Flash player than you currently have installed, and JavaScript turned on to view this content.
Please download the most recent Flash player.
Being green isn't easy, but by definition, great architecture is responsive to both people and the environment. One and Two Victory Park combine the green strategies of highly efficient underfloor air and technology systems, with hyper-efficient floorplates.
Contact BOKA Powell:
info@bokapowell.com
Phone: 972.701.9000
The multi-phased MacArthur Ridge project is located on a sloping site on Hidden Ridge in Las Colinas. Phase I consisted of a six-story 210,000 square foot office building and a five-story 375,000 square foot parking structure. Phase II, a 210,000 square foot office building, was complete in November of 1998. A large paved and landscaped parking plaza has been created in front of the L-shaped precast and glass buildings. A design-build approach was used to construct both Phases of the project.